Difference between revisions of "LBNL-2020: DAQ"

From CMB-S4 wiki
Jump to navigationJump to search
(Created page with "== Charge == == Agenda == == Notes ==")
 
Line 1: Line 1:
 +
== Zoom Info ==
 +
link: [https://lbnl.zoom.us/j/134985614 Zoom Link]
 +
host: Laura N.
 +
 
== Charge ==
 
== Charge ==
 +
 +
* Plan schedule of design reviews for these subsystems needed before CD1
 +
* Plan work schedule for support of initial readout testing
 +
* Plan work schedule HK DAQ software to test-stands and individual labs
 +
  
 
== Agenda ==
 
== Agenda ==
 +
Just one overview and then encourage people to attend other parallels:
 +
 +
[https://docs.google.com/presentation/d/1shWZTK9v4_9SiQpEZoE_X-BPnPxrHD8TWTkkEg9tQ2c/edit?usp=sharing Parallel Slides]
  
 
== Notes ==
 
== Notes ==
 +
 +
Scribe: Nathan W.
 +
Google notes:

Revision as of 11:36, 30 March 2020

Zoom Info

link: Zoom Link host: Laura N.

Charge

  • Plan schedule of design reviews for these subsystems needed before CD1
  • Plan work schedule for support of initial readout testing
  • Plan work schedule HK DAQ software to test-stands and individual labs


Agenda

Just one overview and then encourage people to attend other parallels:

Parallel Slides

Notes

Scribe: Nathan W. Google notes: