Difference between revisions of "LBNL-2020: DM"

From CMB-S4 wiki
Jump to: navigation, search
(Agenda)
(Connection Details)
Line 2: Line 2:
  
 
https://lbnl.zoom.us/j/134985614
 
https://lbnl.zoom.us/j/134985614
 +
 +
[https://docs.google.com/presentation/d/1Mkx9oS-xJIqIKvfMVLf1EOVto_Gdvw_3GfOd0tcDuCo
  
 
Monitor - [mailto:jdborrill@lbl.gov Julian Borrill]
 
Monitor - [mailto:jdborrill@lbl.gov Julian Borrill]

Revision as of 10:43, 31 March 2020

Connection Details

https://lbnl.zoom.us/j/134985614

[https://docs.google.com/presentation/d/1Mkx9oS-xJIqIKvfMVLf1EOVto_Gdvw_3GfOd0tcDuCo

Monitor - Julian Borrill

Scribe - Tom Crawford

Charge

  1. Define the overall scope, schedule, cost & risk of the data management subsystem for the summer review.
  2. Prepare for the baseline design simulations.
  3. Plan the schedule of design reviews needed before CD1.

Agenda

  • Overview (5 min)
  • WBS Level 3 scope, milestones, labor & risk (5 min)
    • 1.09.05 Data Reduction (10 min)
    • 1.09.06 Transients/Sources (10 min)
    • 1.09.04 Data Synthesis (10 min)
    • 1.09.03 Software Infrastructure (10 min)
    • 1.09.02 Data Movement (10 min)
    • 1.09.07 Site Hardware (10 min)
    • 1.09.01 Subsystem Management (10 min)
  • Baseline design simulation tool (10 min)
  • Subsystem design review schedule (10 min)
  • General discussion (10 min)

Notes

Real-time notes on this google doc; please identify your notes with your initials to help with any clarifications when we transfer them to the wiki after the session.