Difference between revisions of "LBNL-2020: Low-ell BB"

From CMB-S4 wiki
Jump to: navigation, search
m (Agenda)
m (Connection details)
Line 1: Line 1:
 
== Connection details ==
 
== Connection details ==
 +
 +
Parallel 1, session D. Tuesday March 31, 9:00 to 11:00 am pacific.
  
 
https://lbnl.zoom.us/j/676588242
 
https://lbnl.zoom.us/j/676588242

Revision as of 12:40, 23 March 2020

Connection details

Parallel 1, session D. Tuesday March 31, 9:00 to 11:00 am pacific.

https://lbnl.zoom.us/j/676588242

Monitor: Kimmy Wu

Scribe: Colin Bischoff

Charge

The primary focus of this meeting will be technical and scientific progress towards the baseline design in general and the summer agency review in particular.

  • Present results from or statuses of data challenge 6 with real delensing incorporated
  • Foreground models / sims
    • Impact of foregrounds on delensing.
    • Foregrounds at low-ell
  • Sketch path(s) forward for data challenges:
    • What questions need answering by the summer’s agency review that need results from data challenges?
  • Outline trade studies that need to be done (or present results of trade studies) for the delensing LAT
    • Sensitivity vs resolution
    • Frequency allocation
  • Outline trade studies that need to be done (or present results of trade studies) for SATs
    • Do we need 20GHz?

Agenda

  • Results from data challenge 06 [45 min]
    • Parametrized likelihood + lensing template [Bischoff, 15 min]
    • Bayesian optimal analysis [Millea, 15 min]
    • SO pipeline [Errard, 15 min]
  • Next steps for data challenges
    • Impacts of foregrounds on delensing [van Engelen, Umiltà]
    • New and/or improved foreground models at low-ell [Hensley]
    • Interface with Data Management sims [Crawford]
    • What other questions do we need to address using data challenges? [all]
  • Inputs for summer agency review
    • Forecasting tool for Flowdown group [McMahon]
    • Design justification studies [Wu]
      • Sensitivity vs resolution for delensing LAT
      • Frequency allocation for delensing LAT
      • Justification for split-bands on SATs
      • Justification for 20 GHz on delensing LAT

Notes