Difference between revisions of "LBNL-2020: M2T Flowdown"

From CMB-S4 wiki
Jump to: navigation, search
(Created page with "== Charge == == Agenda == == Notes ==")
 
(Agenda)
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
  
 
== Agenda ==
 
== Agenda ==
 +
 +
 +
 +
* (5 m) Where do we need to be for the August NSF review? (Zivick)
 +
** One slide of bullets with excerpts from NSF guidance (I can provide this)
 +
** One slide of bullets with excerpts from CME/ATLAS CDR panel charge
 +
** A list of documentation we need to produce. (presentations do not count). Real draft documents, can reference my template.
 +
 +
* (5 min) Where do we need to be for the Spring 2021 DOE CD-1 and NSF PDR reviews? (Similar to 1.)
 +
** Similar to 1. I can provide inputs for NSF PDR, someone else needs to speak to DOE CD-1.
 +
 +
* (10 min) Overview and Status of error budget (McMahon)
 +
** Discussion of gaps and plans to fill.
 +
** Volunteers. Assignments. Due dates.
 +
 +
* (10 min) SAT Error budget overview
 +
 +
Break (10 minutes, will turn into 15)
 +
 +
* (75 min) Discussion for each L2 of what requirements they need.
 +
** One (or at most a few) slide for each with some known requirements to elicit discussion of what is missing.
 +
** 5-10 minute discussion for each L2
  
 
== Notes ==
 
== Notes ==

Revision as of 13:14, 25 March 2020

Charge

Agenda

  • (5 m) Where do we need to be for the August NSF review? (Zivick)
    • One slide of bullets with excerpts from NSF guidance (I can provide this)
    • One slide of bullets with excerpts from CME/ATLAS CDR panel charge
    • A list of documentation we need to produce. (presentations do not count). Real draft documents, can reference my template.
  • (5 min) Where do we need to be for the Spring 2021 DOE CD-1 and NSF PDR reviews? (Similar to 1.)
    • Similar to 1. I can provide inputs for NSF PDR, someone else needs to speak to DOE CD-1.
  • (10 min) Overview and Status of error budget (McMahon)
    • Discussion of gaps and plans to fill.
    • Volunteers. Assignments. Due dates.
  • (10 min) SAT Error budget overview

Break (10 minutes, will turn into 15)

  • (75 min) Discussion for each L2 of what requirements they need.
    • One (or at most a few) slide for each with some known requirements to elicit discussion of what is missing.
    • 5-10 minute discussion for each L2

Notes