Difference between revisions of "LBNL-2020: M2T Flowdown"

From CMB-S4 wiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 4: Line 4:
  
  
+
* (10 m) Overview of flowdown efforts (Lawrence)
* (5 m) Where do we need to be for the August NSF review? (Zivick)
+
* (10 m) Deliverables (Zivick)
** One slide of bullets with excerpts from NSF guidance (I can provide this)
+
** Where do we need to be for the August NSF review?
** One slide of bullets with excerpts from CME/ATLAS CDR panel charge
+
** Where do we need to be for the Spring 2021 DOE CD-1 and NSF PDR reviews?
** A list of documentation we need to produce. (presentations do not count). Real draft documents, can reference my template.
 
 
 
* (5 min) Where do we need to be for the Spring 2021 DOE CD-1 and NSF PDR reviews? (Similar to 1.)
 
** Similar to 1. I can provide inputs for NSF PDR, someone else needs to speak to DOE CD-1.
 
  
 
* (10 min) Overview and Status of error budget (McMahon)
 
* (10 min) Overview and Status of error budget (McMahon)
** Discussion of gaps and plans to fill.
 
** Volunteers. Assignments. Due dates.
 
  
 
* (10 min) SAT Error budget overview
 
* (10 min) SAT Error budget overview
 
   
 
   
Break (10 minutes, will turn into 15)
+
Break (10)
 
   
 
   
* (75 min) Discussion for each L2 of what requirements they need.  
+
* (70 min) Discussion for each L2 of what requirements they need.  
 
** One (or at most a few) slide for each with some known requirements to elicit discussion of what is missing.  
 
** One (or at most a few) slide for each with some known requirements to elicit discussion of what is missing.  
 
** 5-10 minute discussion for each L2
 
** 5-10 minute discussion for each L2
  
 
== Notes ==
 
== Notes ==

Revision as of 16:51, 25 March 2020

Charge

Agenda

  • (10 m) Overview of flowdown efforts (Lawrence)
  • (10 m) Deliverables (Zivick)
    • Where do we need to be for the August NSF review?
    • Where do we need to be for the Spring 2021 DOE CD-1 and NSF PDR reviews?
  • (10 min) Overview and Status of error budget (McMahon)
  • (10 min) SAT Error budget overview

Break (10)

  • (70 min) Discussion for each L2 of what requirements they need.
    • One (or at most a few) slide for each with some known requirements to elicit discussion of what is missing.
    • 5-10 minute discussion for each L2

Notes