Difference between revisions of "LBNL-2020: M2T Flowdown"

From CMB-S4 wiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 27: Line 27:
 
* (20 min) Overview and Status of error budget (McMahon) [https://docs.google.com/presentation/d/1EUjst_T5q8SUH0UCvIhwT9tXIYOpHwgICDWxW9hddOg/edit?usp=sharing slides]
 
* (20 min) Overview and Status of error budget (McMahon) [https://docs.google.com/presentation/d/1EUjst_T5q8SUH0UCvIhwT9tXIYOpHwgICDWxW9hddOg/edit?usp=sharing slides]
  
* (20 min) SAT Error budget overview (Bischoff)
+
* (20 min) SAT Error budget overview (Bischoff) [https://docs.google.com/presentation/d/1Bl8nkAlpKqoh0dY2IUHEDAfg5RJhgbvYBMOESk6ZSWE slides]
  
 
* (20 min) Baseline design simulations  (Zonca and Keskitalo)
 
* (20 min) Baseline design simulations  (Zonca and Keskitalo)

Revision as of 08:38, 1 April 2020

Connection Details

https://lbnl.zoom.us/j/411685173

Host - Charles Lawrence

Scribe -

Charge

Discuss flowdown from measurement requirements to instrument and experiment requirements. Emphasis on the critical role of error budgets in setting performance requirements, and an overview of the structure of requirements.

Two take-away assignments for L2 leaders and teams:

  • What is missing from the error budgets in your area?
  • What analysis and simulation capabilities do we need but do not yet have that connect the elements of the error budget?

Agenda

  • (20 m) Overview of flowdown efforts File:M2T flowdown CMB-S4 04-01-2020.pdf (Lawrence)
  • (10 m) success criteria (Zivick)
    • Where do we need to be for the August NSF review?
    • Where do we need to be for the Spring 2021 DOE CD-1 and NSF PDR reviews?
  • (20 min) Overview and Status of error budget (McMahon) slides
  • (20 min) SAT Error budget overview (Bischoff) slides
  • (one slide) Homework

Notes