Difference between revisions of "LBNL-2020: Telescope Interfaces: DRM and DAQ"

From CMB-S4 wiki
Jump to: navigation, search
(Created page with "== Charge == == Agenda == == Notes ==")
 
(Notes)
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
== Charge ==
 
== Charge ==
 +
Telescopes Interfaces w/DRM, DAQ
 +
  1. Present/determine description of interfaces. Feedthroughs, cabling, control systems, control software, data formats, etc.
 +
  2. Plan schedule of design reviews for these subsystems needed before CD1
 +
 +
Zoom link information:
 +
  https://lbnl.zoom.us/j/818598127
  
 
== Agenda ==
 
== Agenda ==
 +
DAQ Interfaces
 +
  1. Inputs to DAQ subssytem
 +
  2. Outputs from DAQ subsystem
 +
  3. Necessary review meetings through March 2021
 +
 +
DRM Interfaces (Detector/Readout/Module)
 +
  1. Inputs to DR Module
 +
  2. Outputs from DR Module
 +
  3. Necessary review meetings through March 2021
  
 
== Notes ==
 
== Notes ==
 +
Google docs page for meeting notes. Please add and edit as you feel is necessary and valuable.
 +
  https://docs.google.com/document/d/1FPDvJ-go7uwmnbGWvTLCo6qK98-OoAAkGyZy_dfjG34/edit?usp=sharing

Revision as of 17:21, 25 March 2020

Charge

Telescopes Interfaces w/DRM, DAQ

  1. Present/determine description of interfaces. Feedthroughs, cabling, control systems, control software, data formats, etc.
  2. Plan schedule of design reviews for these subsystems needed before CD1

Zoom link information:

  https://lbnl.zoom.us/j/818598127

Agenda

DAQ Interfaces

  1. Inputs to DAQ subssytem
  2. Outputs from DAQ subsystem
  3. Necessary review meetings through March 2021

DRM Interfaces (Detector/Readout/Module)

  1. Inputs to DR Module
  2. Outputs from DR Module
  3. Necessary review meetings through March 2021

Notes

Google docs page for meeting notes. Please add and edit as you feel is necessary and valuable.

 https://docs.google.com/document/d/1FPDvJ-go7uwmnbGWvTLCo6qK98-OoAAkGyZy_dfjG34/edit?usp=sharing