Difference between revisions of "LBNL-2020: Telescope Interfaces: DRM and DAQ"

From CMB-S4 wiki
Jump to navigationJump to search
Line 4: Line 4:
  
 
== Charge ==
 
== Charge ==
Telescopes Interfaces w/DRM, DAQ [https://docs.google.com/presentation/d/1aIo7Hsr9IwNsv7um8PKoWPtoBHTvFm28cGdAD-Jic2E/edit#slide=id.g726658cab8_0_117
+
Telescopes Interfaces w/DRM, DAQ  
Google slides]
 
 
   1. Present/determine description of interfaces. Feedthroughs, cabling, control systems, control software, data formats, etc.
 
   1. Present/determine description of interfaces. Feedthroughs, cabling, control systems, control software, data formats, etc.
 
   2. Plan schedule of design reviews for these subsystems needed before CD1
 
   2. Plan schedule of design reviews for these subsystems needed before CD1
Line 25: Line 24:
 
   3. Necessary review meetings through March 2021
 
   3. Necessary review meetings through March 2021
 
    
 
    
   Slides: [[File:TelescopeReadoutInterfaces_20200331.pdf]]
+
   Slides: [[File:TelescopeReadoutInterfaces_20200331.pdf]] [https://docs.google.com/presentation/d/1aIo7Hsr9IwNsv7um8PKoWPtoBHTvFm28cGdAD-Jic2E/edit#slide=id.g726658cab8_0_117
 +
SAT DAQ/DRM interfaces]
  
 
== Notes ==
 
== Notes ==
 
Google docs page for meeting notes. Please add and edit as you feel is necessary and valuable.
 
Google docs page for meeting notes. Please add and edit as you feel is necessary and valuable.
 
   https://docs.google.com/document/d/1FPDvJ-go7uwmnbGWvTLCo6qK98-OoAAkGyZy_dfjG34/edit?usp=sharing
 
   https://docs.google.com/document/d/1FPDvJ-go7uwmnbGWvTLCo6qK98-OoAAkGyZy_dfjG34/edit?usp=sharing

Revision as of 09:14, 1 April 2020

Host: Jeff Zivick

Scribe: Jeff Zivick

Charge

Telescopes Interfaces w/DRM, DAQ

  1. Present/determine description of interfaces. Feedthroughs, cabling, control systems, control software, data formats, etc.
  2. Plan schedule of design reviews for these subsystems needed before CD1


Zoom link information:

  https://lbnl.zoom.us/j/177357834

Agenda

DAQ Interfaces DAQ slides so far

  1. Inputs to DAQ subssytem
  2. Outputs from DAQ subsystem
  3. Necessary review meetings through March 2021

DRM Interfaces (Detector/Readout/Module)

  1. Inputs to DR Module
  2. Outputs from DR Module
  3. Necessary review meetings through March 2021
  
  Slides: File:TelescopeReadoutInterfaces 20200331.pdf [https://docs.google.com/presentation/d/1aIo7Hsr9IwNsv7um8PKoWPtoBHTvFm28cGdAD-Jic2E/edit#slide=id.g726658cab8_0_117

SAT DAQ/DRM interfaces]

Notes

Google docs page for meeting notes. Please add and edit as you feel is necessary and valuable.

 https://docs.google.com/document/d/1FPDvJ-go7uwmnbGWvTLCo6qK98-OoAAkGyZy_dfjG34/edit?usp=sharing