Difference between revisions of "LBNL-2020: Telescope Interfaces: Sites and I&C"

From CMB-S4 wiki
Jump to: navigation, search
(Created page with "== Charge == == Agenda == == Notes ==")
 
(Charge)
Line 1: Line 1:
 
== Charge ==
 
== Charge ==
 +
 +
General guidance:
 +
“The primary focus of this meeting will be technical and scientific progress towards the baseline design in general and the summer agency review in particular.”
 +
* Review the upcoming milestones, review, advisory committee formation etc.
 +
* What are the most urgent tasks/decisions to get collaboration input, where do you need help?
 +
* Plan schedule of design reviews needed before CD-1
 +
 +
Review LAT/SAT sites requirements and define/review interfaces, make sure they are complete.
 +
* Lay out N. American + Chile/Pole I&T plan
 +
    * Includes common staffing plan
 +
    * Includes test hardware requirements, sharing plan
 +
* Write down test plan both in N. America and Chile/Pole, or determine path to knowing that plan
 +
* Plan schedule of design reviews for these subsystems needed before CD1
  
 
== Agenda ==
 
== Agenda ==
  
 
== Notes ==
 
== Notes ==

Revision as of 19:02, 24 March 2020

Charge

General guidance: “The primary focus of this meeting will be technical and scientific progress towards the baseline design in general and the summer agency review in particular.”

* Review the upcoming milestones, review, advisory committee formation etc.
* What are the most urgent tasks/decisions to get collaboration input, where do you need help?
* Plan schedule of design reviews needed before CD-1

Review LAT/SAT sites requirements and define/review interfaces, make sure they are complete.

* Lay out N. American + Chile/Pole I&T plan
   * Includes common staffing plan 
   * Includes test hardware requirements, sharing plan
* Write down test plan both in N. America and Chile/Pole, or determine path to knowing that plan
* Plan schedule of design reviews for these subsystems needed before CD1

Agenda

Notes