Difference between revisions of "LBNL-2020: Telescope Interfaces: Sites and I&C"

From CMB-S4 wiki
Jump to: navigation, search
(Charge)
(Agenda)
Line 15: Line 15:
  
 
== Agenda ==
 
== Agenda ==
 +
 +
* Quick Introduction/Summary of Site requirements in DSR
 +
* Quick review of I&C schedule and resources in DSR, and how those overlap with N. America SAT/LAT work
 +
 +
* LAT site requirements, I&C thoughts (from LAT group)
 +
* SAT site requirements, I&C thoughts (from SAT group)
 +
 +
* Discussion
  
 
== Notes ==
 
== Notes ==

Revision as of 19:04, 24 March 2020

Charge

General guidance: “The primary focus of this meeting will be technical and scientific progress towards the baseline design in general and the summer agency review in particular.”

* Review the upcoming milestones, review, advisory committee formation etc.
* What are the most urgent tasks/decisions to get collaboration input, where do you need help?
* Plan schedule of design reviews needed before CD-1

Review LAT/SAT sites requirements and define/review interfaces, make sure they are complete.

* Lay out N. American + Chile/Pole I&T plan
   * Includes common staffing plan 
   * Includes test hardware requirements, sharing plan
* Write down test plan both in N. America and Chile/Pole, or determine path to knowing that plan
* Plan schedule of design reviews for these subsystems needed before CD1

Agenda

  • Quick Introduction/Summary of Site requirements in DSR
  • Quick review of I&C schedule and resources in DSR, and how those overlap with N. America SAT/LAT work
  • LAT site requirements, I&C thoughts (from LAT group)
  • SAT site requirements, I&C thoughts (from SAT group)
  • Discussion

Notes