Difference between revisions of "LBNL-2020: Telescope Interfaces: Sites and I&C"

From CMB-S4 wiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 26: Line 26:
 
* Layout requirements, Chile site layout brainstorming (Kam will share screen)
 
* Layout requirements, Chile site layout brainstorming (Kam will share screen)
 
* LAT site requirements, I&C thoughts (from LAT group)
 
* LAT site requirements, I&C thoughts (from LAT group)
* SAT site requirements, I&C thoughts (from SAT group)
+
* SAT site requirements, I&C thoughts (from SAT group) [https://docs.google.com/presentation/d/1LHBgqUonm7YCSQJRXF_3Etd8cX436eCfjVW5m21B9OM/edit?usp=sharing]
  
 
* ICDs:
 
* ICDs:

Revision as of 18:48, 31 March 2020

Charge

General guidance: “The primary focus of this meeting will be technical and scientific progress towards the baseline design in general and the summer agency review in particular.”

  • Review the upcoming milestones, review, advisory committee formation etc.
  • What are the most urgent tasks/decisions to get collaboration input, where do you need help?
  • Plan schedule of design reviews needed before CD-1

Review LAT/SAT sites requirements and define/review interfaces, make sure they are complete.

  • Lay out N. American + Chile/Pole I&T plan
    • Includes common staffing plan
    • Includes test hardware requirements, sharing plan
  • Write down test plan both in N. America and Chile/Pole, or determine path to knowing that plan
  • Plan schedule of design reviews for these subsystems needed before CD1

Agenda

Realtime Notes

  • Layout requirements, Chile site layout brainstorming (Kam will share screen)
  • LAT site requirements, I&C thoughts (from LAT group)
  • SAT site requirements, I&C thoughts (from SAT group) [1]


  • Discussion

Notes