** Updated info that went into RFI: https://docs.google.com/presentation/d/1RRVplavnxqME6yH3wh80P42WWg-CUgM9EP_8WCWyrFQ/edit?usp=sharing slides]
 
** Updated info that went into RFI: https://docs.google.com/presentation/d/1RRVplavnxqME6yH3wh80P42WWg-CUgM9EP_8WCWyrFQ/edit?usp=sharing slides]
 
* Review of I&C schedule and resources in DSR, and how those overlap with N. America SAT/LAT work [https://docs.google.com/spreadsheets/d/11vKtmXvEN-BNPMCTffeSbTiuZlxqoXE85Y6AbEpezsU/edit?usp=sharing]
 
* Review of I&C schedule and resources in DSR, and how those overlap with N. America SAT/LAT work [https://docs.google.com/spreadsheets/d/11vKtmXvEN-BNPMCTffeSbTiuZlxqoXE85Y6AbEpezsU/edit?usp=sharing]
 +
* * Discuss how we staff the parallel activities.
 +
* * Discuss how we can jointly plan for testing and calibration hardware.
  
 
* Layout requirements, Chile site layout brainstorming (Kam will share screen)
 
* Layout requirements, Chile site layout brainstorming (Kam will share screen)

Revision as of 20:09, 31 March 2020

Charge

General guidance: “The primary focus of this meeting will be technical and scientific progress towards the baseline design in general and the summer agency review in particular.”

  • Review the upcoming milestones, review, advisory committee formation etc.
  • What are the most urgent tasks/decisions to get collaboration input, where do you need help?
  • Plan schedule of design reviews needed before CD-1

Review LAT/SAT sites requirements and define/review interfaces, make sure they are complete.

  • Lay out N. American + Chile/Pole I&T plan
    • Includes common staffing plan
    • Includes test hardware requirements, sharing plan
  • Write down test plan both in N. America and Chile/Pole, or determine path to knowing that plan
  • Plan schedule of design reviews for these subsystems needed before CD1

Agenda

Realtime Notes

  • Quick Introduction/Summary of Site requirements in DSR:
  • Review of I&C schedule and resources in DSR, and how those overlap with N. America SAT/LAT work [1]
  • * Discuss how we staff the parallel activities.
  • * Discuss how we can jointly plan for testing and calibration hardware.
  • Layout requirements, Chile site layout brainstorming (Kam will share screen)
  • LAT site requirements, I&C thoughts (from LAT group)
  • SAT site requirements, I&C thoughts (from SAT group) [2]


  • Discussion

Notes