General guidance:
 
General guidance:
 
“The primary focus of this meeting will be technical and scientific progress towards the baseline design in general and the summer agency review in particular.”  
 
“The primary focus of this meeting will be technical and scientific progress towards the baseline design in general and the summer agency review in particular.”  
* Review the upcoming milestones, review, advisory committee formation etc.
+
* Review the upcoming milestones, review, advisory committee formation etc.
* What are the most urgent tasks/decisions to get collaboration input, where do you need help?
+
* What are the most urgent tasks/decisions to get collaboration input, where do you need help?
* Plan schedule of design reviews needed before CD-1
+
* Plan schedule of design reviews needed before CD-1
  
 
Review LAT/SAT sites requirements and define/review interfaces, make sure they are complete.
 
Review LAT/SAT sites requirements and define/review interfaces, make sure they are complete.
* Lay out N. American + Chile/Pole I&T plan
+
* Lay out N. American + Chile/Pole I&T plan
    * Includes common staffing plan  
+
* Includes common staffing plan  
    * Includes test hardware requirements, sharing plan
+
* Includes test hardware requirements, sharing plan
* Write down test plan both in N. America and Chile/Pole, or determine path to knowing that plan
+
* Write down test plan both in N. America and Chile/Pole, or determine path to knowing that plan
* Plan schedule of design reviews for these subsystems needed before CD1
+
* Plan schedule of design reviews for these subsystems needed before CD1
  
 
== Agenda ==
 
== Agenda ==

Revision as of 18:05, 24 March 2020

Charge

General guidance: “The primary focus of this meeting will be technical and scientific progress towards the baseline design in general and the summer agency review in particular.”

  • Review the upcoming milestones, review, advisory committee formation etc.
  • What are the most urgent tasks/decisions to get collaboration input, where do you need help?
  • Plan schedule of design reviews needed before CD-1

Review LAT/SAT sites requirements and define/review interfaces, make sure they are complete.

  • Lay out N. American + Chile/Pole I&T plan
* Includes common staffing plan 
* Includes test hardware requirements, sharing plan
  • Write down test plan both in N. America and Chile/Pole, or determine path to knowing that plan
  • Plan schedule of design reviews for these subsystems needed before CD1

Agenda

  • Quick Introduction/Summary of Site requirements in DSR
  • Quick review of I&C schedule and resources in DSR, and how those overlap with N. America SAT/LAT work
  • LAT site requirements, I&C thoughts (from LAT group)
  • SAT site requirements, I&C thoughts (from SAT group)
  • Discussion

Notes