Difference between revisions of "LBNL-2020: Testing Facilities"

From CMB-S4 wiki
Jump to: navigation, search
Line 1: Line 1:
 +
 +
Link back to main meeting page:
 +
* [[LBNL-2020: Cosmology with CMB-S4]]
 +
 
== Charge ==
 
== Charge ==
  

Revision as of 13:54, 24 March 2020

Link back to main meeting page:

Charge

  • Present an overall testing plan
    • 1st, for 2020/2021 prototype wafers,
    • Longer term plans (should include optics tube testing)
    • Are any setups doing both readout and detector testing, or is it going to be all separate? Present/develop plan for getting enough capacity, and uniformity/consistency of testing setups.
  • Plan schedule of design reviews for these subsystems needed before CD1

Agenda

Notes