Requirements Flowdown

From CMB-S4 wiki
Revision as of 14:34, 15 January 2019 by Lknox (talk | contribs)
Jump to: navigation, search

This page tracks work towards refining the links and traceability between Science requirements, measurement requirements and system/instrument requirements.

Meetings

Biweekly starting January 15, 12:30pm pacific/3:30pm eastern

Uberconference cmbs4a

(866-578-4799 or 480-999-2448)

January 15, 2019

Link to SC report to this group here:

Link to CMB requirements flowdown presentation:

Materials

As a first step, we will use the following spreadsheet to make sure we have links to basis documentation backing the various requirements that the collaboration has already identified. This tool will also help us identify holes in the flowdown that need to be filled.

Project google drive folder

Click here.

Reference documents