Difference between revisions of "UCSD-2019: Analysis/Pipeline Working Group: Low-ell BB"

From CMB-S4 wiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 32: Line 32:
 
# Introduction by everyone in the room: who? where? what aspects of low-ell BB interest you? 5 minutes
 
# Introduction by everyone in the room: who? where? what aspects of low-ell BB interest you? 5 minutes
 
# Recap of the plan for this session/CD-1 goals [https://docs.google.com/presentation/d/1Mg1LAUMPJQuLv_Qlk0rXA51KijHwe9BYMAZaLfziE4Y/edit?usp=sharing slides][Wu], 3 minutes
 
# Recap of the plan for this session/CD-1 goals [https://docs.google.com/presentation/d/1Mg1LAUMPJQuLv_Qlk0rXA51KijHwe9BYMAZaLfziE4Y/edit?usp=sharing slides][Wu], 3 minutes
# Review of Fisher based S4 forecasting thus far leading to DSR appendix A [Ben/Victor/Raphael], 15 minutes
+
# Review of Fisher based S4 forecasting thus far leading to DSR appendix A [https://cmb-s4.org/wiki/images/UCSD_PGW_lowellBB_vbuza.pdf Ben/Victor/Raphael], 15 minutes
 
# Review of Map based S4 forecasting thus far and ideas for next steps [https://docs.google.com/presentation/d/13WQ7t6cyAfchYjKEGw3iuR1U_8QxEC7pJAHmNUmqjXQ Clem], 10 minutes
 
# Review of Map based S4 forecasting thus far and ideas for next steps [https://docs.google.com/presentation/d/13WQ7t6cyAfchYjKEGw3iuR1U_8QxEC7pJAHmNUmqjXQ Clem], 10 minutes
 
# Review of forecasting and simulations for Simons Observatory inflation science [Alonso / Errard / Sherwin], [https://docs.google.com/presentation/d/12m5qjX8jRa1nFZBwdAeFUOQY3CsW43LnMIubRAgG5OQ/edit?usp=sharing slides] [https://drive.google.com/file/d/1XmSwtMbtV0yuqwBngwM-f7IAfgQp6UAB/view?usp=sharing delensing slides] 30 minutes
 
# Review of forecasting and simulations for Simons Observatory inflation science [Alonso / Errard / Sherwin], [https://docs.google.com/presentation/d/12m5qjX8jRa1nFZBwdAeFUOQY3CsW43LnMIubRAgG5OQ/edit?usp=sharing slides] [https://drive.google.com/file/d/1XmSwtMbtV0yuqwBngwM-f7IAfgQp6UAB/view?usp=sharing delensing slides] 30 minutes

Revision as of 14:14, 18 October 2019

Link back to agenda

Charge

  1. Identify key decisions that must be made (and justified) prior to CD-1,
  2. Make progress on (or actually make) those decisions,
  3. Lay out a timeline and process for making each decision, consistent with the post-decision work and internal reviews that will be needed to complete preparations for CD-1,
  4. Ensure that those timelines and processes are understood and supported by the collaboration, and that we (together) believe we can follow them.

Key Issues

  • How do we optimize detector allocation across frequency in the face of uncertainty about foreground properties, for both the SATs and the delensing LAT?
  • What are the advantages of split bands? How does performance compare to non-split bands?
  • Do we need a 20 GHz channel on delensing LAT (for SAT science)
  • How well will de-lensing work in practice?
  • What are the necessary analysis tools to answer these questions?

What is CD-1?

Blatantly copied from Analysis/Pipeline Working Group: Maps to C_ell:

Background/clarifying questions:

  • What does “by CD-1” mean, and what are the implications for when tools need to be in place and working?
    • According to APC white paper (https://arxiv.org/abs/1908.01062), CD-1 is in Q3 of FY2021 (so June 2021?).
      • But according to project office, "Plan [must be] finalized by start of 2020 for delivering...CD-1"
    • Working backward from there, any tool that could reasonably influence a CD-1 decision needs to be in place and working by ... ?
    • Give an example timeline for an example decision?

Agenda

  1. Introduction by everyone in the room: who? where? what aspects of low-ell BB interest you? 5 minutes
  2. Recap of the plan for this session/CD-1 goals slides[Wu], 3 minutes
  3. Review of Fisher based S4 forecasting thus far leading to DSR appendix A Ben/Victor/Raphael, 15 minutes
  4. Review of Map based S4 forecasting thus far and ideas for next steps Clem, 10 minutes
  5. Review of forecasting and simulations for Simons Observatory inflation science [Alonso / Errard / Sherwin], slides delensing slides 30 minutes
  6. Plans for working group [all], ~60 minutes
    1. Forecasting
      • Quantitative comparison of SO and CMB-S4 DSR forecasts
      • Optimization of delensing effort: update for DSR sensitivity, motivation for frequency coverage, feedback from real delensing efforts
    2. Data Challenge simulations
      • More / better foreground models
      • Instrumental systematics
      • Other map non-idealities, i.e. filtering / mode loss
      • Coordination with technical groups on instrument configuration, etc
      • What else needs to be demonstrated for CD1?
      • Bottlenecks for sim production
    3. Analysis of Data Challenges
      • Who plans to participate? How do we get more participation?
      • Delensing
    4. Specific Data Challenge plan / timeline
      • Experiment config 06: DSR configuration, in progress
      • Update / reoptimization of delensing survey?
      • Inclusion of instrumental systematics -- which ones? how to include?
      • Data Challenges coming out of Data Management group

Remote attendance

Zoom link


Notes