Difference between revisions of "UCSD-2019: Cosmology with CMB-S4"

From CMB-S4 wiki
Jump to: navigation, search
(Saturday October 19th)
(Saturday October 19th)
Line 70: Line 70:
  
 
08:30 - Parallel 5
 
08:30 - Parallel 5
* Cross-Cuts: Pixel Size/f-Number Optimization, Readout/DAQ/Control Testing, Simulations for Technical Requirements,Joint Probes & Cross-Correlations
+
* Cross-Cuts: Pixel Size/f-Number Optimization, Readout/DAQ/Control Testing, Simulations for Technical Requirements, Joint Probes & Cross-Correlations
 
* Committees: Education & Public Outreach
 
* Committees: Education & Public Outreach
  

Revision as of 10:08, 17 September 2019

Workshop overview

The San Diego workshop continues a successful series of meetings bringing together the CMB experimental and theoretical community to plan a coordinated, stage-4 ground-based CMB experiment.

The meeting will be held at UC San Diego, October 17th-19th 2019, starting first thing Thursday morning and ending Saturday lunchtime.

Meeting Info & Registration

Official Workshop Website: Registration, Participants, Hotels, Logistics.

About This Wiki

As for previous workshops, we will use this wiki to organize the sessions, to capture the input from them, and to develop next steps. Participants are encouraged to edit the wiki directly, including uploading plots or a few slides.

Hints for formatting this wiki can be found here


Agenda

Preliminary agenda - work in progress

Thursday October 17th

08:00 - Coffee

08:30 - Plenary 1

  • Collaboration & Project updates
  • Science Themes
  • L2 reports

12:30 - Lunch

13:30 - Parallel 1

  • Technical Working Groups: Detectors, LATs, Data Management
  • Science Drivers: PGW+Inflation, Dark Universe, Matter Mapping, Transients

15:45 - Parallel 2

  • Technical Working Groups: Readout, SATs, DAQ
  • Science to Measurement Flowdown

17:30 - Fireslides

18:00 - Posters/Social

[19:00 - Governing Board]

Friday October 18th

08:00 - Coffee

08:30 - Plenary 2

  • Reports back from Parallels 1 & 2

12:30 - Lunch

13:30 - Parallel 3

  • Measurement to Technical Requirements Flowdown
  • Analysis/Pipeline Working Groups: Low-ell BB, Maps to C_ell, Maps to Other Stats, Sources

15:45 - Parallel 4

  • Technical Working Group: Modules + Detector/Readout Testing
  • Cross-Cuts: Site Resource Requirements, Cryo-optics, Shielding & Sidelobes, Atmosphere/Ground-Pickup Simulation, Delensing, Sky Modeling

17:30 - Fireslides

Saturday October 19th

08:00 - Coffee

08:30 - Parallel 5

  • Cross-Cuts: Pixel Size/f-Number Optimization, Readout/DAQ/Control Testing, Simulations for Technical Requirements, Joint Probes & Cross-Correlations
  • Committees: Education & Public Outreach

09:30 - Parallel 6

  • Cross-Cuts: Receiver Interfaces, Validation & Calibration, Simulations for Measurement Requirements
  • Committees: Education & Public Outreach (continued)

11:00 - Plenary

12:30 - Closeout