UCSD-2019: Cross-Cut: Simulations for Technical Requirements

From CMB-S4 wiki
Revision as of 09:23, 19 October 2019 by Zonca (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Link back to agenda

Charge

Follow up to measurement to technical flowdown session with detailed definitions of inputs and outputs to required simulations for pre-CD1 requirements definition.

Agenda

DM Simulation Plan

Required Inputs

Discussion

Slides: https://docs.google.com/presentation/d/15rC963Jab2dAwMgaGc2bAWacayv5lRXxunU05sqphsE/edit?usp=sharing

Remote attendance

Zoom link

Notes

https://docs.google.com/document/d/19PJQoCHUawADIU90gsIJVZ7WGeIBI9WqSW0b9oNY6E4/edit?usp=sharing